| S.NO |
: |
Description |
|
| 1 |
: |
Grease
to be filled or checked once in 30 days. Filling the grease
through grease Nipple is not sufficient. Therefore you can
open the Flange cover of Bearing Block, fill - up by hand
fully and refit the flange properly. The grease should be
Graphite Black Grease Moloygrafh R.B. |
|
| 2 |
: |
Hammers
can be replaced by removing two lock rings on Rotor and
take out the Hammers. New Hammers to be fixed by balancing
only otherwise lot of vibration will be created. All the
Hammers after welding are to be even weight to avoid vibrations. |
|
| 3 |
: |
All Bolts & Nuts to be checked once in 15 days |
|
| 4 |
: |
Balloons
(Cloth Bags) to be cleaned by tapping with a stick slowly.
Do not waste the Bags in water. If you put the bags in Water
all the air holes will be blocked and production will be
affected. |
|
| 5 |
: |
You
should not overload the Machine, therefore an Amps meter
is a must, to avoid over loading. You should not start the
machine with overload in main chamber. Chamber can be cleaned
by opening the Doors of the chamber. Frequent overloading
being a waste of time. Whizer can be adjusted as per your
requirement. Do not forget to tighten the Clamp bolts. Otherwise
this will damage the shaft or castings |
|
| 6 |
: |
Check
up the alignment between drive pulley and motor pulley. |
|
| 7 |
: |
The
Hot air produced by the Chamber, while grinding should go
out freely to keep the Chamber cool, therefore grinding
will be improved. Hence we suggest very Big Balloons to
be fitted on top, of the cyclone and top of the dust collector.
Do not use Polythene bags or HDPE bags in discharge end
of the cyclone or dust collector. Use any Gada Cloth. |
|
| 8 |
: |
Wherever
holes are provided in the automatic system of the machine,
oil should be poured (few drops) by using an oil can. |
|
| 9 |
: |
All
spare parts are Available |
|
| 10 |
: |
You
cannot grind Quartz & Feldspar in the machine |
|
| 11 |
: |
RPM
of the machine should not exceed more than the instruction
given in our pro forma. |
|
| 12 |
: |
This
Machine is suitable for Dry grinding only. |
|
|
Items to be procured by the buyer
Our standard supply does not include for any items not mentioned in the
following specification and in particular excludes the following.
Electric Motor, Starter, Main Switch, Ampere meter, Capacitor, Slide
Rails, Foundation Bolts, Motor-V-Pulley, Cotton Dust Bags & Balloons,
V-Belts and Bolt Nuts & Dust Collector Angles.
|